The LNG Tank 7 and New LNG Jetty Project of MLNG at Bintulu was named The Proposed PETRONAS LNG Tank 7 Piping and Associated Facilities in Bintulu, Division Sarawak. This project is in-line with the development of the Train 9 Project at the same MLNG Facility in Bintulu which is build a new LNG Storage tank and its associated facilities including onshore piping facilities, a new LNG jetty and a new loading structure at the new jetty topside to be integrated to Train 9 production facility. The introduction of this Project aims to reduce berth utilization and berth occupancy rates of the existing LNG berth, to increase LNG product storage buffer capacity, to provide flexibility in jetty/berth maintenance and to allow for the ability to load the LNG product into Pacific Max Class carriers.
This massive Project comprises three (3) packages:
- PACKAGE 1: LNG Tank 7 Turnkey EPCC
- PACKAGE 2: EPCC for Tank 7 Piping and Associated Facilities (PAF)
- PACKAGE 3: Capital Dredging and Construction of the Proposed New LNG Jetty (Berth 4)
Each package is awarded to different contractors, with three (3) different contractors awarded for Package 3. The Projects involved works of multidiscipline and a wide range of coverage and from the environmental standpoint, it needs to fulfil a set of stringent requirements set forth by the Department of Environment from Putrajaya, DOE Sarawak and also their Bintulu Division.
The services rendered by Chemsain to the 3 packages of work are as summarized below: